https://www.triplinx.ca/
Printing date: 10/20/2020

If you have any issues regarding accessibility, please contact us through the Triplinx Feedback Form

Disruption From 9/29/2020 4:18 pm to 10/21/2020 2:44 pm

The elevator connecting the station building to the tunnel is out of service. The station remains accessible via the elevators from the station building up to the third floor of the parking structure, then cross the pedestrian bridge, where other elevators are available to take you to the platform.

Affected route(s)

  • Train MI Milton GO Transit

    towards Milton GO
    • Erindale GO, MISSISSAUGA
    towards Union Station
    • Erindale GO, MISSISSAUGA