https://www.triplinx.ca/
Printing date: 10/19/2020

If you have any issues regarding accessibility, please contact us through the Triplinx Feedback Form

Disruption From 10/12/2020 12:01 am to 10/20/2020 3:28 pm

Upgrades to all three elevators in the east tunnel start October 19. Entrance to the platforms can be accessed through the pedestrian bridge elevators accessed from the north and south parking lots. Learn more about construction here.

Affected route(s)

  • Train LE Lakeshore East GO Transit

    towards Oshawa GO
    • Pickering GO, PICKERING
    towards Union Station
    • Pickering GO, PICKERING